Construction demo
Drawing and specification discrepancy analysis
Find where architectural, structural and MEP documents disagree, while it is still a drawing problem rather than a site problem.
The challenge
Disciplines are drawn separately and reconciled late, so contradictions are usually discovered by a trade on site, at the worst possible cost.
The scenario
Before issuing for construction, a design manager wants to know where the architectural and MEP drawings disagree about the same ceiling void.
What goes in
- Multi-discipline drawing set
- Architectural, structural and MEP drawings covering the same areas.
- Specifications
- Written specifications accompanying the drawings.
What you can ask
Illustrative prompts. Results depend on your own data and are not deterministic.
- “Identify discrepancies between the architectural and MEP plans.”
- “Where do the drawings and specification disagree?”
- “What information is missing to price this scope?”
How Clearception approaches it
How the work is structured. Each step shows what its output is grounded in.
Align by space
ObservedMatch what each discipline says about the same physical location.
Compare statements
AI-inferredIdentify where dimensions, levels or components conflict.
Classify the conflict
AI-inferredSeparate genuine contradiction from missing information.
Cite both sides
SourceReport each conflict with both source sheets attached.
What you get
The shape of what comes back — not a promised result.
Conflict register
SourceEach conflict with the two sheets that disagree and the location.
Missing-information list
ObservedScope that cannot be priced or built from what is issued.
Why it matters
- Found while it is cheap
- A coordination problem costs far less on a drawing than on a slab.
- Fewer RFIs later
- Missing information is identified before a trade needs it.
Related demos
Construction
From drawings to a project plan
Turn a drawing set into a work breakdown, schedule and preliminary estimate, with every line linked to a sheet.
5 minute walkthrough
- Document Intelligence
- Quantity Takeoff
- Schedule Generation
Construction
From bill of materials to procurement plan
Turn extracted quantities into packages, lead times and an order calendar tied to the schedule.
4 minute walkthrough
- Quantity Takeoff
- Procurement Planning
- Schedule Generation
Pipeline
Commit-to-production traceability
Follow a single change from commit through review, build and release to what is running now.
3 minute walkthrough
- Delivery Traceability
- Evidence Trail
Want to try this with your own work?
Open Construction and bring your own data. No signup is needed to read these demos.